YEŞİLYURT ENERJİ ELEKTRİK ÜRETİM A.Ş.
Natural Gas Combined Cycle Plant / Samsun - Tekkeköy
Yeşilyurt Enerji went into action to carry out business activities in the lines of investment, generation and trading in the energy industry.
The capacity of the Natural Gas Combined Cycle Plant which was put into operation on 04.08.2013 was increased on 16.02.2018 and the current installed power reached 234,452 MWh.
The plant contains 12 pieces of Wartsila brand and 18V50SG model gas engines with the generation capacity of 18.320 KWhe for each and the auxiliary equipment thereof, one piece of Siemens brand and SST-300 model steam turbine with the generation capacity of 14.670 KWhe and the auxiliary equipment thereof, 12 pieces of Erensan Waste Heat Boilers with the superheated steam production capacity of 9.000 kg/h, one piece of Cooling Tower, one piece of Water Treatment Unit and 3 pieces of 100MVA Transformer Switching Plant for electricity transmission.